Permission or permit
Project duration must be defined, with a maximum of four weeks; deposit and meter fee are due before the meter is set; meter must be returned before 10:00 a.m. on the predetermined return date.
108 W. Jackson Street, Willard, MO 65781
Operated by City of Willard
At a glance
Plan your fill
Before you arrive
Project duration must be defined, with a maximum of four weeks; deposit and meter fee are due before the meter is set; meter must be returned before 10:00 a.m. on the predetermined return date.
This pin is an administrative program office, not a water-dispensing point. Water is obtained only from an approved hydrant after the program requirements are completed. Renter assumes costs for damage to the meter, hydrant, water lines, or other infrastructure.
Confirm before filling
More options nearby